01 23 45 67 89

Once the scaffolding came down

What customers said

Sandrine L.Storm tarping, Rezé
"The storm took half the ridge tiles on a Sunday night. The tarp was on by Monday noon, the photos went to the insurer the same day, and the repair was booked before the assessor had even called."
Gérard M.Leak repair, Orvault
"Two companies wanted to redo the whole roof. He went up, replaced about thirty tiles and a length of flashing, and told me the rest would hold for another fifteen years."
Claire and Julien V.Slate roof renewal, Carquefou
"Our whole slate roof: scaffolding up on the Monday, tarped every evening, gutters redone in zinc, and a garden cleaner at the end than at the start."

Roof check or damage report

Tell us what the wind did

A check before winter or damage after a gale: the address, the type of roof and a few words are enough.

Water coming in? Call01 23 45 67 89

Roof checks and storm repairs

After every gale, someone has to go up and look.

A roof rarely gives way in one go. A ridge tile lifts, a slate slips, and the next rain finds the gap. We check, we photograph, we fix before the water gets in.

The Beaufort scale, seen from the roof

Effects on land as described by the Beaufort scale. The last line is our advice.

Force 862 to 74 km/h

Gale

Twigs break off trees, walking against the wind is hard.

Next day, look at the verges and the gutters from the ground.

Force 975 to 88 km/h

Strong gale

Slight damage to buildings: chimney pots and slates blown off.

Have the roof checked before the next rain.

Force 1089 to 102 km/h

Storm

Trees uprooted, considerable damage to buildings.

Photos, tarp, then declare it to your insurer.

Force 11103 to 117 km/h

Violent storm

Very rare on land, with widespread damage.

Stay clear of the house fronts, call us once the wind drops.

What we check on every call-out

Ten-year insurance

The certificate comes with every quote.

RGE certified

The condition for insulation grants.

Safety before climbing

Scaffolding or guardrails in place before the first tile comes off.

Site left clean

Old tiles and offcuts taken away, gutters emptied.

Recent jobs

Job records

Roof renewed, dormer restored

A 1930s house re-tiled from ridge to gutter, with the dormer flashing redone in zinc.

Material
Interlocking clay tiles
Duration
12 days
Town
Rezé
Year
2025

Natural slate, three dormers

A full slate roof hooked by hand, with the cheeks of three dormers rebuilt.

Material
Natural slate, hooked
Duration
4 weeks
Town
Orvault
Year
2025

Standing-seam zinc roof

A low-pitched roof covered in zinc, the chimney flashing shaped and soldered on site.

Material
Natural zinc
Duration
9 days
Town
Nantes
Year
2024

Three roof windows for a loft conversion

A dark loft turned into two bedrooms, three windows cut into the tiled slope.

Material
Roof windows and flashing kits
Duration
3 days
Town
Carquefou
Year
2025

From the first call to the handover

Four stages, none skipped

01

We come and look

We climb onto the roof before pricing anything, and send you the photos of what we saw.

02

A written, detailed quote

Materials, area, scaffolding, waste removal: every line priced, the insurance certificate attached.

03

The work, on the agreed dates

The roof is made watertight every evening, even halfway through the job.

04

Handover and guarantee

We walk round the job with you and you sign the handover: the ten-year cover starts that day.

The sky before the gust: the moment to check the gutters, not the one to climb.

Good to know

Before you sign anything for your roof

After the wind

After a storm

Report the damage to your home insurer within the time your policy allows, usually five working days: storm cover is compulsory in every home policy. Take photos and have the roof tarped, the insurer expects you to limit the damage.

Natural disaster status

It only applies once an order is published in the Journal officiel; you then have 30 days to declare. Wind damage usually falls under the storm cover instead.

Also good to know

Changing how the roof looks

A new material, a new colour or a new roof window means a prior declaration at the town hall. Processing usually takes a month, longer near listed buildings. We put the file together with you.

Ten-year cover

For ten years after handover, it covers damage that undermines the roof or makes the building unfit for use. Ask for the certificate: a serious roofer hands it over without being asked twice.

Insulation grants

Roof insulation can be funded by MaPrimeRénov' as part of a whole-home renovation, and by energy-saving premiums (CEE), provided an RGE-certified firm does the work. The rules change often: a France Rénov' adviser (0 808 800 700) will tell you what applies to you.

Door-to-door offers

We never knock on doors. If someone rings about "urgent" moss removal, remember that you have 14 days to cancel, and that no payment can be demanded within the first 7 days.

Our stations

Towns we cover and how soon we get there.

Carquefou

44470

within 48 h

La Chapelle-sur-Erdre

44240

within 48 h

Nantes

44000

within 24 h

Orvault

44700

within 48 h

Rezé

44400

within 24 h

Saint-Herblain

44800

within 24 h

Saint-Sébastien-sur-Loire

44230

within 24 h

Vertou

44120

within 48 h